• Increase font size
  • Default font size
  • Decrease font size
Currently under overhaul GWR 9682 due for completion summer 2012
RSH BIRKENHEAD Overhauled in 2009 by us to full working order
currently situated at the plym valley railway for crown stay work and annual boiler exam
the works will be completed shortly and will be availible for hire, please contact US or the GWR preservation group for details !
ANDREW BARCLAY LOCOMOTIVE ALBERT
New firebox and vast boiler overhaul completed in 2007 by us now a regular performer at its home base on the plym valley railway devon
This locomotive was also based at East kent railway with Albert seen  below
Peckett William Murdoch
william murdoch was overhauled by us in 2007 after more than 10 years as a static display at southall
and is now in full working order, however the locomotive is not currently fitted with vaccum brakes so has restricted use this may
 change in the near future to enable it to be hired to other preserved lines
Barclay  GWR 701
This locomotive was restored by us from a very poor state in 2004 and was one of the biggest transformations we have undertaken so far with nearly all parts being overhauled repaired or replaced but it has proved to be a regular performer on many heritage lines, this locomtoive was known as "spitfire" and was based on the East kent railway but was little used and was transformed by us at the owners request into a mock up barclay aquired by the GWR to perform shunting duties at dock yards of south wales  
   


 
 

Welcome to teifel.co.uk
A Complete Service
Tailored to Suit

visits

img_1200908566_899 img_1200908529_121 img_1200908578_869 img_1200908598_832 img_1200907266_415 img_1200908556_411 img_1200908407_838 img_1200908472_888 img_1200908588_951 img_1200908452_623